FBC-Carrollton Underway!

aerial 91117773 ADJ 500

src=”http://brownbrownandassociatesblog.com/wp-content/uploads/2009/10/FBC-CARR-constr2.jpg” alt=”FBC-Carrollton Project Underway!” width=”500″ height=”199″ />
Heavy dirt moving equipment hit the site on September 1, 2009.
Site Rendering

The entire Phase 1 scope of work as seen from above.

FBCC Ministry – Sports-Pocket PC

FBC-Carrollton Sports Ministry Spraygrounds

Play Fountain plaza between the two playgrounds.

 

The new Sports Ministry Complex of FBC-Carrollton is underway!  The tractors and bulldozers are on the land, the surveyors have staked the property, and the plans have been put together.  Once the City gives a nod of approval, construction preparations will be underway.  The construction project includes:  

  • 2 lighted soccer/football fields
  • 2 lighted softball/baseball fields with stands and bleachers
  • 4 lighted sand volleyball courts
  • 7,000 square feet Sports Ministry Building including 3 meeting rooms (these can convert to 1 large room) and open to the outside, restrooms, offices, and lounge area with self-serve coffee station
  • separate playgrounds for toddlers and children with a “sprayground” for all ages
  • covered pavilion area for picnicking and barbecuing
  • concession stand
  • walking trail

Benefits of this sports ministry include an evangelism strategy, a discipleship tool, and a means for fellowship.

  • Print this article!
  • Digg
  • del.icio.us
  • Facebook
  • Mixx
  • E-mail this story to a friend!
  • LinkedIn
  • MySpace
  • Technorati
  • Twitter
  • Yahoo! Bookmarks

Visit Brown Brown & Associates Home Page
October 9, 2009 · Posted in First Baptist Carrollton, Project News  
    

Comments

Leave a Reply